Image Frame
The tender has expired
Tenders Comparison Table
Unlock the table amounts now and get a clear view of true market prices!
20 +VAT
Project Description
🟧 Short Project Description

🟧 Project Location
🟧 Project Characteristics
(main structural material)
🟧 Project Size
! If the project concerns renovation/extension, the fields Building, Number of Floors and Number of Basements refer only to the space under renovation/extension
(covered areas)
(ground plus upper floors)
🟧 Additional Project Details
(excluding VAT)
If you are not sure of the postcode you can look it up here
Image Image
Conditions & Requirements
🟧 This Project is open to tenders only from Contractors that meet the following requirements:
1. Obligatory Contractor Characteristics
(similar in terms of «Project Type», e.g. house, and in terms of «Construction Type», e.g concrete)
2. Contractor Commitments towards Project Owner
🟧 Special Notes of Owner/Consultant for the Attention of Contractors
🟧 Electrical – Mechanical Works
Plans & Documents

For this project, the following documents are available:
The documents are available only in digital form !

File NameDate UploadedLanguageDetailsActions
1. Architectural Plans (1 files) 
2. Structural / Civil Engineering Plans (1 files) 
3. Bill of Quantities (1 files) 
4. Electrical Plans (1 files) 
5. Mechanical Plans (1 files) 
6. Topographical Plan (1 files) 
7. Other Plans, Documents, Pictures (2 files) 
🟧 Contact Details of Project Owner/Consultant
Project Owner
Project Architect
Tenders Table
🟧 The Project has expired. The range of tenders (without VAT) given* is:
Tenders Comparison Table
Unlock the table amounts now and get a clear view of true market prices!
20 +VAT
Lowest Highest
(hidden) (hidden)
#Bill of QuantitiesOffer 1Offer 2Offer 3Offer 4Offer 5**
1Preliminaries••••.••••••.••••••.••••••.••••••.••7%
2Earthworks••••.••••••.••••••.••••••.••••••.••4%
3Formwork••••.••••••.••••••.••••••.••••••.••6%
4Formwork••••.••••••.••••••.••••••.••••••.••7%
5Rebar in Concrete••••.••••••.••••••.••••••.••••••.••7%
6Rebar in Concrete••••.••••••.••••••.••••••.••••••.••4%
7Rebar in Concrete••••.••••••.••••••.••••••.••••••.••1%
8Concrete••••.••••••.••••••.••••••.••••••.••9%
9Concrete••••.••••••.••••••.••••••.••••••.••3%
10Waterproofing••••.••••••.••••••.••••••.••••••.••2%
11Thermal Insulations, Waterproofing••••.••••••.••••••.••••••.••••••.••5%
12Masonry••••.••••••.••••••.••••••.••••••.••3%
13Coatings••••.••••••.••••••.••••••.••••••.••4%
14Flooring, Substrates••••.••••••.••••••.••••••.••••••.••6%
15Coverings, Dry Works, Sills, Thresholds, Wooden Panels HPL••••.••••••.••••••.••••••.••••••.••3%
16Sanitary Ware••••.••••••.••••••.••••••.••••••.••1%
17External Sewerage••••.••••••.••••••.••••••.••••••.••3%
18Paintworks••••.••••••.••••••.••••••.••••••.••3%
19Dry Works••••.••••••.••••••.••••••.••••••.••1%
20Steelworks••••.••••••.••••••.••••••.••••••.••2%
21Builders' Assistance, General Assistance, Provisional Sums••••.••••••.••••••.••••••.••••••.••23%
22Sundry Works••••.••••••.••••••.••••••.••••••.••1%
 Adjustment +/-••••.••••••.••••••.••••••.••••••.••0%
 Total••••.••••••.••••••.••••••.••••••.••100%
 Price per m² (for 287 m²)••••.••••••.••••••.••••••.••••••.•• 
#Indicative Unit Prices for WorksOffer 1Offer 2Offer 3Offer 4Offer 5
1Contractors All Risks Insurance (€)2.000,00750,001.200,00700,001.400,00
2Purchase of Construction Contract P/LS/MC(1) from MEDSK (€)950,00800,00700,00500,001.000,00
3Work Scaffolding (€)9.000,005.500,005.500,0010.500,008.000,00
4General Excavation in Semi-hard Soil (€/m3)10,0013,006,505,759,00
5General Backfilling with Crusher-run (€/m3)33,0030,0034,0029,9035,00
6Transport of Excavated Materials Off-Site (€/m3)5,009,006,507,489,00
7Formwork for Standard-Faced Columns (€/m2)28,0025,0022,0020,0027,50
8Formwork for Fair-Faced Slabs (€/m2)22,0021,0018,0019,0026,40
9Formwork for Single Sided Fair-Faced Retaining Walls (€/m2)33,0035,0036,0040,0038,50
10Formwork for Fair-Faced Board-Marked Columns (€/m2)52,0080,0045,0060,0082,50
11Formwork for Fair-Faced Board-Marked Perimeter Walls (€/m2)52,0025,0040,0060,0082,50
12Rebar in Concrete B500C (€/Kg)1,251,301,301,211,40
13Concrete C30/37 with Crystalline Admixture for Raft Foundation (€/m3)136,00140,00126,00145,62174,00
14Concrete C30/37 with Crystalline Admixture for Columns (€/m3)148,00140,00150,00163,17162,00
15Concrete C30/37 for Columns (€/m3)125,00120,00143,00134,75158,00
16Concrete C30/37 for Slabs (€/m3)120,00120,00120,00123,88129,00
17Waterproofing with 2 Layers of 4mm-thick Bituminous Membrane (€/m2)26,0036,0028,0028,7535,00
18Waterproofing with Cementitious Mortar and Fiberglass Mesh (€/m2)23,0035,0018,0020,7028,00
19Thermal Insulation of Floors with 100mm Extruded Polystyrene (€/m2)19,0020,0017,0020,1322,00
20Masonry with 250mm Thick Standard Clay Bricks (€/m2)55,0055,0052,0055,2022,00
21Masonry with 100mm Thick Standard Clay Bricks (€/m2)35,0040,0032,0029,9016,00
22Plastering Externally in 3 Coats (€/m2)26,0022,0022,0020,7022,00
23Plastering Internally in 3 Coats (€/m2)26,0015,0022,0020,7022,00
24Concrete C20/25 for Substrate (€/m3)133,33166,67146,67163,00200,00
25Installation of Ceramic Tiles with Cement-Based Adhesive on Floors (€/m2)26,0030,0021,0029,9030,00
26Installation of Ceramic Tiles with Cement‑Based Adhesive on Walls (€/m2)31,0030,0022,0033,3530,00
27Spatoula 2 Coats and Paint 3 Coats on Interior Plasterboards (€/m2)16,0015,0015,0014,9517,25
28Plasterboard 12,5mm for Internal Suspended Ceiling (€/m2)35,0029,0028,0037,9511,50