Project Description
🟧 Short Project Description

🟧 Project Location
🟧 Project Characteristics
(main structural material)
🟧 Project Size
! If the project concerns renovation/extension, the fields Building, Number of Floors and Number of Basements refer only to the space under renovation/extension
(covered areas)
(ground plus upper floors)
🟧 Additional Project Details
To be agreed later
(excluding VAT)
If you are not sure of the postcode you can look it up here
Image Image
Conditions & Requirements
🟧 This Project is open to tenders only from Contractors that meet the following requirements:
1. Obligatory Contractor Characteristics
(similar in terms of «Project Type», e.g. house, and in terms of «Construction Type», e.g concrete)
2. Contractor Commitments towards Project Owner
🟧 Special Notes of Owner/Consultant for the Attention of Contractors
🟧 Electrical – Mechanical Works
Plans & Documents

For this project, the following documents are available:
The documents are available only in digital form !

File NameDate UploadedLanguageDetailsActions
1. Architectural Plans (1 files) 
2. Structural / Civil Engineering Plans (1 files) 
3. Bill of Quantities (1 files) 
4. Electrical Plans (1 files) 
7. Other Plans, Documents, Pictures (1 files) 
🟧 Contact Details of Project Owner/Consultant
Project Owner
Project Architect
Tenders Table
🟧 The Project has expired. The range of tenders given* is:
Tenders Comparison Table
Unlock the table amounts now and get a clear view of true market prices!
20 +VAT
Lowest Highest
(hidden) (hidden)
#Bill of Quantities (€ excl. V.A.T)Offer 1Offer 2Offer 3Offer 4Offer 5**
1Preliminaries53.600,0034.400,0049.000,0088.100,00320.000,008%
2Earthworks37.430,0031.702,0049.215,0033.464,0036.088,003%
3Concrete4.466,004.060,004.547,007.917,005.278,000%
4Concrete86.806,00101.375,0092.580,00107.457,50102.997,007%
5Formwork66.086,0083.130,0075.500,0071.330,1087.755,005%
6Formwork13.080,0015.376,0013.493,0015.018,3024.517,001%
7Concrete, Formwork, Rebar in Concrete50.256,0037.370,0033.630,0033.083,0035.425,003%
8Concrete, Formwork, Rebar in Concrete12.990,0012.280,0019.410,0011.574,0014.009,001%
9Rebar in Concrete8.628,008.987,5024.113,609.347,009.347,001%
10Rebar in Concrete37.752,0039.325,0037.670,0040.898,0040.898,003%
11Rebar in Concrete24.144,0025.150,0024.113,6026.156,0026.156,002%
12Rebar in Concrete12.888,0013.425,0012.884,4013.962,0013.962,001%
13Rebar in Concrete26.100,0027.187,5025.943,4028.275,0028.275,002%
14Rebar in Concrete24.600,0025.625,0024.468,4026.650,0026.650,002%
15Rebar in Concrete5.748,005.987,505.744,606.227,006.227,000%
16Waterproofing18.448,0020.990,0016.582,0021.430,6024.090,001%
17External Sewerage1.890,003.400,002.700,002.155,006.000,000%
18Masonry46.012,0060.555,0047.149,0059.594,0049.255,004%
19Coatings40.530,0050.685,0037.786,0042.730,0046.830,003%
20Coverings, Waterproofing10.266,0011.430,008.855,0011.430,0010.647,001%
21Coatings, Thermal Insulations42.806,0059.230,0044.383,0053.336,0048.835,003%
22Coverings, Waterproofing18.536,0025.535,0019.546,0021.836,8021.988,002%
23Flooring, Substrates10.654,008.244,0012.463,0014.649,9012.252,001%
24Flooring, Substrates, Waterproofing17.735,0018.035,0019.098,0023.080,5022.586,001%
25Flooring, Substrates, Waterproofing12.693,0012.985,0013.938,0016.590,5016.258,001%
26Flooring, Substrates, Waterproofing12.745,0013.045,0013.954,0016.755,5016.306,001%
27Flooring, Substrates8.305,008.913,007.865,008.754,509.191,001%
28Substrates, Thermal Insulations, Waterproofing25.768,0026.220,0020.149,0033.253,0026.996,002%
29Dry Works, Thermal Insulations25.916,0025.855,0027.078,0036.814,3029.657,002%
30Builders' Assistance, General Assistance10.500,0012.000,0018.500,0019.300,0043.000,001%
31Paintworks45.304,0035.043,0036.696,0056.197,0034.546,003%
32Provisional Sums516.000,00494.000,00496.000,00494.000,00494.000,0035%
 Adjustment +/--8.682,000,000,000,00-21,000%
 Total1.320.000,001.351.545,501.335.055,001.451.366,501.690.000,00100%
 Price per m² (for 1.446 m²)9139359231.0041.169 
#Unit Prices for Indicative Works (excl. V.A.T)Offer 1Offer 2Offer 3Offer 4Offer 5
1Purchase of Construction Contract P/LS/MC(1) from MEDSK (€)2.500,001.000,002.500,003.000,003.000,00
2Contractors All Risks Insurance (€)2.500,002.000,002.500,003.000,003.000,00
3Construction Site Management Personnel (€)14.000,001.000,001.500,0030.000,00205.900,00
4Work Scaffolding (€)15.000,0018.000,0010.000,0025.000,0030.000,00
5General Excavation in Semi-hard Soil (€/m3)12,0010,007,008,509,00
6General Backfilling with Selected Excavated Material (€/m3)20,008,0010,008,509,00
7General Backfilling with Crusher-run (€/m3)30,0033,3335,0033,3333,33
8Transport of Excavated Materials Off-Site (€/m3)8,007,007,008,5010,00
9Concrete C12/15 for Blinding Layer (€/m3)110,00100,00110,00195,00130,00
10Concrete C30/37 for Raft Foundation (€/m3)112,00125,00120,00132,50127,00
11Concrete C30/37 for Columns (€/m3)120,00125,00130,00132,50127,00
12Concrete C30/37 for Slabs (€/m3)120,00125,00130,00132,50127,00
13Formwork for Fair‑Faced Perimeter Walls (€/m2)24,0030,0025,0024,0065,00
14Formwork for Standard-Faced Columns (€/m2)22,0025,0021,0021,9022,00
15Formwork for Fair-Faced Slabs (€/m2)22,0025,0023,0024,1022,00
16Rebar in Concrete B500C (€/Kg)1,201,251,181,301,30
17Manhole Precast 750 x 750 x 1.500 mm for Connection with EOA Sewerage System (€/Νο.)450,001.000,00500,00275,002.000,00
18Masonry with 250mm Thick Standard Clay Bricks (€/m2)48,0065,0051,0069,0055,00
19Masonry with 100mm Thick Standard Clay Bricks (€/m2)33,0045,0026,0036,0035,00
20Plastering Internally in 2 Coats (€/m2)21,0025,0016,0022,0018,00
21Plastering Internally in 3 Coats (€/m2)24,0030,0024,0025,0030,00
22Installation of Ceramic Tiles with Cement‑Based Adhesive on Walls (€/m2)28,0030,0025,0030,0029,00
23Waterproofing with Cementitious Mortar and Fiberglass Mesh (€/m2)25,0030,0020,0030,0026,00
24Thermal Insulation of Facades with 80mm Extruded Polystyrene and Acrylic Finish (€/m2)54,0060,0051,0060,0055,00
25Installation of Capping Slabs with Cement-Based Adhesive on Perimeter Walls (€/m)22,0030,0022,0025,2022,00
26Concrete C20/25 for Substrate (€/m3)100,00115,38192,31230,77207,69
27Installation of Ceramic Tiles with Cement-Based Adhesive on Floors (€/m2)30,0030,0027,0028,0030,00
28Thermal Insulation of Floors with 80mm Extruded Polystyrene (€/m2)17,0020,0014,0022,0019,00
29Cement Board 12,5mm for External Suspended Ceiling (€/m2)30,0030,0035,0046,8034,00
30Spatoula 2 Coats and Paint 3 Coats on Interior Fair-Faced Concrete (€/m2)14,0012,0014,5018,0015,00
* The amounts result from the tenders uploaded by the bidding Contractors on Projects.cy. Projects.cy does not check the tenders for any errors or omissions; this is done at a later stage by the project Consultant.
** Average price of tenders in chapter ÷ Average price of tenders in Total