Project Description
🟧 Short Project Description

🟧 Project Location
🟧 Project Characteristics
(main structural material)
🟧 Project Size
! If the project concerns renovation/extension, the fields Building, Number of Floors and Number of Basements refer only to the space under renovation/extension
(covered areas)
(ground plus upper floors)
🟧 Additional Project Details
(excluding VAT)
If you are not sure of the postcode you can look it up here
Image Image
Conditions & Requirements
🟧 This Project is open to tenders only from Contractors that meet the following requirements:
1. Obligatory Contractor Characteristics
(similar in terms of «Project Type», e.g. house, and in terms of «Construction Type», e.g concrete)
2. Contractor Commitments towards Project Owner
🟧 Special Notes of Owner/Consultant for the Attention of Contractors
🟧 Electrical – Mechanical Works
Plans & Documents

For this project, the following documents are available:
The documents are available only in digital form !

File NameDate UploadedLanguageDetailsActions
1. Architectural Plans (2 files) 
2. Structural / Civil Engineering Plans (1 files) 
3. Bill of Quantities (1 files) 
4. Electrical Plans (3 files) 
6. Topographical Plan (1 files) 
7. Other Plans, Documents, Pictures (2 files) 
🟧 Contact Details of Project Owner/Consultant
Project Owner
Project Architect
Tenders Table
🟧 The Project has expired. The range of tenders (without VAT) given* is:
Tenders Comparison Table
Unlock the table amounts now and get a clear view of true market prices!
50 +VAT
Lowest Highest
(hidden) (hidden)
#Bill of QuantitiesOffer 1Offer 2Offer 3**
1Preliminaries••••.••••••.••••••.••5%
2Earthworks••••.••••••.••••••.••5%
3Concrete, Formwork, Rebar in Concrete, Thermal Insulations, Waterproofing••••.••••••.••••••.••7%
4Waterproofing••••.••••••.••••••.••1%
5Coverings, Thermal Insulations, Waterproofing, Woodworks••••.••••••.••••••.••5%
6Dry Works••••.••••••.••••••.••17%
7Flooring, Sills, Substrates, Thermal Insulations, Thresholds, Waterproofing••••.••••••.••••••.••4%
8Coatings, Thermal Insulations••••.••••••.••••••.••4%
9Paintworks••••.••••••.••••••.••2%
10Gutters••••.••••••.••••••.••1%
11Builders' Works in Connection to Installations••••.••••••.••••••.••1%
12External Works••••.••••••.••••••.••3%
13Fencing Walls••••.••••••.••••••.••13%
14Builders' Works in Connection to Installations, External Sewerage••••.••••••.••••••.••2%
15General Assistance••••.••••••.••••••.••2%
16Provisional Sums••••.••••••.••••••.••29%
17Dayworks••••.••••••.••••••.••0%
 Adjustment +/-••••.••••••.••••••.••-1%
 Total••••.••••••.••••••.••100%
 Price per m² (for 189 m²)••••.••••••.••••••.•• 
#Indicative Unit Prices for WorksOffer 1Offer 2Offer 3
1Work Scaffolding (€)3.500,003.500,001.320,00
2Transport of Excavated Materials Off-Site (€/m3)10,0011,008,80
3General Backfilling with Crusher-run (€/m3)22,0035,0024,20
4Concrete C25/30 with Crystalline Admixture for Raft Foundation (€/m3)115,00140,00126,50
5Polystyrene Concrete 1.000 kg/m3 on Trapezoidal Decking (€/m3)170,00160,00137,50
6Rebar in Concrete B500C (€/Kg)1,301,191,32
7Plasterboard Fireproof 12,5mm for Internal Suspended Ceiling (€/m2)42,0057,5037,40
8Concrete C20/25 for Substrate (€/m3)216,67225,00201,67
9Installation of Ceramic Tiles with Cement-Based Adhesive on Floors (€/m2)24,0027,0033,00
10Waterproofing with Cementitious Mortar and Fiberglass Mesh (€/m2)25,0023,0016,50
11Thermal Insulation of Floors with 80mm Extruded Polystyrene (€/m2)12,5020,0013,20
12Spatoula 2 Coats and Paint 3 Coats on Interior Plasterboards (€/m2)19,0017,008,80
13Rebar in Concrete Y8/200 with A252 Mesh (€/m2)12,0018,007,15
14Waterproofing with 1 Layer of 4mm‑thick Bituminous Membrane (€/m2)18,0016,0016,50
15Painting 3 Coats on External Surfaces (€/m2)7,0012,009,90
* The amounts result from the tenders uploaded by the bidding Contractors on Projects.cy. Projects.cy does not check the tenders for any errors or omissions; this is done at a later stage by the project Consultant.
** Average price of tenders in chapter ÷ Average price of tenders in Total